I still had a little time left, so I looked for another small job that would get me closer to being able to complete the wiring and pipe runs before boxing in with panels.
The handbrake assembly seemed a good bet. This needs to be in place in order to route the fuel and brake lines through the tunnel without risk of snagging against the moving parts of the handbrake.
Not a difficult job at all - just a few minutes to position and bolt the lever down, assemble the link cable and brake cables and attached them all together. I chose to use the lower of the attachment points on the base of the handbrake lever for the link bar. Simply because the cable seemed to snag if I used the upper one.
No comments:
Post a Comment